Crawling Creatures 2025 Part 4
Need to continue with next part. Legs go. Get it?
Lift Legs
I have noticed that the Crab seems to be starting to Stick to the pan. I decided to Lift it to a new place before continuing.
Mould Legs
The Legs got a little damaged whilst Lifting so I have had to Mould them again.
White Ball
Change of Colour. I need to make a White Ball. Like before I will divide it in half.
Roll Eyes
Now I have two parts I have Rolled them into Small Balls. These will become the base for the Eyes.
Grr Wrong Place
Grr I dropped it on the Wrong Spot. I have taken it off but of course some residue has stuck fast.
No comments:
Post a Comment