Autumn
Cape Bag 2022 Part 50
The Toggles are finally dry and I am no longer getting ink on my fingers so are ready for use.
Extra Loop
I have Knitted another I-Cord and Sewn it to form a Loop.
I have added the Extra Loop in the Centre of the others.
Mark with Pins
I need to match up the Toggles with the Loops. This is
not as straightforward as the other side as the Material Length is slightly
Wider. I have placed the Material and Marked with Pins where the Toggles should
be Sewn
Three Toggles
I decided to use the Original Toggles first. I have Sewn
them at the two ends and in the Centre.
Vertical Toggles
I have encountered a problem. I had been so concerned
about making sure the Loops were Sewn on the thicker Material that I had not
thought about the amount of space between.
Therefore, I have Sewn the new Toggles Vertically. Perhaps losing a Toggle and having to use Smaller ones has become an advantage.
Finished Toggles
I have Finished Sewing all the Toggles in place. Whilst not perfect I am satisfied with the End result.
No comments:
Post a Comment