Autumn
Cape 2016 A long Term Project
Sleeves
Part 4
This blog should be the final one regarding the Sleeves apart from
any embellishments. I will dispense with the majority of the making of Sleeve 2
as it mostly is a repeat of Sleeve 1
Side 1 Joined to Back
Prior to starting on the Second Sleeve I finished off
the First Sleeve and Side by joining it to the Back of the Cape. In the photograph
above I pinned it at the top prior to sewing.
Unlike the Sleeve which I sewed together using Mattress
Stitch this time I used Back Stitch. Due to the weight and placing of the join
I needed something much stronger.
If you remember in the previous blog the last
photograph was the one below. This clearly shows the Side to which the Sleeve
is joined is unfinished and held on a Stitch Holder.
First Sleeve
Before I pinned it at the top I slipped the stitches
off the Stitch Holder and back on to the needle I had knitted it on. Therefore
when I had sewn down as far as I possible I could gauge how many rows were
needed to reach the bottom of the Back of the Cape.
Side 1 Extra Rows Added
I then could move on to the Second Sleeve. I only took
a couple of photographs at essential points.
Second Sleeve Decrease
Second Sleeve End of First Pictorial Chart
Second Sleeve Prior to Sewing
I then proceeded to sew up the Sleeve and then joined
that Side to the Back of the Cape. I am not sure if I had miscounted or just
sewn it tighter but I needed to add more rows to the bottom.
Side 2 Extra Rows
So apart from the embellishments that completes the
Sleeves, Back and Sides
Both Sides Added
NB.
Got this Blog finished just in time. Happy Birthday
Cayt
No comments:
Post a Comment